1949 Chevrolet Gasser

Click the picture to see additional images on the topic

Arthur Lever’s project for classes at The Hot Rod Institute in Rapid City, South Dakota

1949 Chevrolet Gasser Project

1949 Chevrolet Gasser Project

Move into The Hot Rod Institute and body removal

Move into The Hot Rod Institute and body removal

Front Straight Axle fabrication

Front Straight Axle fabrication

Engine Mount Fabrication

Engine Mount Fabrication

Rear End Fabrication

Rear End Fabrication

Four Bar and Coil Over Install

Four Bar and Coil Over Install

Body meets Frame

Body meets Frame

Transmission Mount, Front drive shaft loop and Wheel Wells

Transmission Mount, Front drive shaft loop and Wheel Wells

Reconstruction of Left Rear Extended Rocker Panel

Reconstruction of Left Rear Extended Rocker Panel

Firewall cut to fit engine

Firewall cut to fit engine

 

 

 

 

 

 

Put Motor in Chassis

Put Motor in Chassis

 

 

 

 

 

 

Firewall Clearance for new Engine

Firewall Clearance for new Engine

Exhaust System - Exhaust Manifold to Tail Pipe

Exhaust System – Exhaust Manifold to Tail Pipe

 

 

 

 

 

 

Continuation of Exhaust and Rear Axle Positioning

Continuation of Exhaust and Rear Axle Positioning (CarNuts Meeting)

Fabrication of Transmission Mount and Relocation of Front Spring Mounts

Fabrication of Transmission Mount and Relocation of Front Spring Mounts

Four Bar Setup

Four Bar Setup

DSC_7640

Radiator and Core Support

Homecoming for 2017 Winter Projects

 

 

 

 

 

 

Gasser Move Back to the Trailer

 

Leave a Reply